St. Paul Avenue and E. North Street Project Profile

Waukesha County, WisDOT IDs 2210-01-71/72

Client

  • Waukesha County

Dates

  • Construction 2012

Waukesha County, WisDOT IDs 2210-01-71/72

This project was a $4.5M complete urban reconstruction of E. North Street and a reconstruction and concrete milling and overlay of E. St. Paul Avenue. Due to high traffic volumes as the main route into the City and the accommodation to the Metro Station located between both roadways, construction required complex staging.

This project also included the replacement of the City water main and storm sewer. Extensive removal of contaminated soil and excavation below subgrade were required and involved extensive coordination.

Key Elements

  • Urban reconstruction
  • Complex staging
  • HMA pavement
  • Concrete curb and gutter
  • Concrete sidewalk
  • Lighting
  • Signage
  • Pavement markings
  • Water main replacement
  • Storm sewer replacement
  • Contaminated soil removal
  • Excavation below subgrade